Writy.
  • Home
  • Park News
  • Buyer’s Guide
  • PIE Event Home
    • PIE 2026 Event
    • PIE 2025 Event
      • PIE25 Attendee Registration and Travel Details
      • PIE25 Agenda and Content Details
      • PIE25 Exhibitor & Sponsor Partnerships
      • PIE25 ParkFlix Film Festivial
      • Contact PIE25
  • Segments
    • Higher Education
    • Municipal
    • Airport
    • Valet
    • Medical
    • Events
    • Commercial
    • Retail
    • Hospitality
  • Technologies
    • Gated
    • Ungated
    • Enforcement
    • Payments
    • Permits
    • Vehicle Detection
    • Wayfinding and Occupancy
    • Curb Management
    • Valet
    • Events
    • EV Charging
    • Analytics
    • Consumables
    • Lighting
  • Suppliers
    • Private Operators
    • Consultants
    • Engineers
    • Architects
    • Financial
    • Insurance
    • Mergers and Acquisitions
  • Industry Resources
    • Subscribe to Parking Today
    • Advertise with Us
    • Magazines
    • Industry Events
    • Conference Companion
    • Dealers, Installers & Suppliers – Listings
    • Industry News
    • Parking Jobs Network & RFP/RFQ’s
    • Associations
    • Podcast Network
    • Next Level – Webinar
    • Contact
No Result
View All Result
Writy.
  • Home
  • Park News
  • Buyer’s Guide
  • PIE Event Home
    • PIE 2026 Event
    • PIE 2025 Event
      • PIE25 Attendee Registration and Travel Details
      • PIE25 Agenda and Content Details
      • PIE25 Exhibitor & Sponsor Partnerships
      • PIE25 ParkFlix Film Festivial
      • Contact PIE25
  • Segments
    • Higher Education
    • Municipal
    • Airport
    • Valet
    • Medical
    • Events
    • Commercial
    • Retail
    • Hospitality
  • Technologies
    • Gated
    • Ungated
    • Enforcement
    • Payments
    • Permits
    • Vehicle Detection
    • Wayfinding and Occupancy
    • Curb Management
    • Valet
    • Events
    • EV Charging
    • Analytics
    • Consumables
    • Lighting
  • Suppliers
    • Private Operators
    • Consultants
    • Engineers
    • Architects
    • Financial
    • Insurance
    • Mergers and Acquisitions
  • Industry Resources
    • Subscribe to Parking Today
    • Advertise with Us
    • Magazines
    • Industry Events
    • Conference Companion
    • Dealers, Installers & Suppliers – Listings
    • Industry News
    • Parking Jobs Network & RFP/RFQ’s
    • Associations
    • Podcast Network
    • Next Level – Webinar
    • Contact
No Result
View All Result
Writy.
No Result
View All Result

Prefabricated Precision

by parkingtodaystaff
January 2, 2025
in Architects, Commercial, Consultants, Digital, Engineers
Prefabricated Precision

The parking structure for the new Kilroy Oyster Point life science campus in San Francisco merges modular construction with seismic safety and style.

By Aaron Alhady

In the urban landscape of South San Francisco, the birthplace of biotechnology and the second-largest life science market in the country, a new landmark is taking shape — Kilroy Oyster Point (KOP). When complete, this 4-million-square-foot, 50-acre campus will serve as a hub for life science progress, innovation, and discovery.

You might also like

Guest Experience Doesn’t Start in the Lot: It Starts in Their Inbox

Guest Experience Doesn’t Start in the Lot: It Starts in Their Inbox

May 1, 2025
Not Just a Garage but a Landmark

Not Just a Garage but a Landmark

May 1, 2025

First impressions are everything, and for Kilroy Oyster Point’s visitors and tenants, the 10-story, 665,000-square-foot parking structure, situated adjacent to three buildings within the KOP campus, will set the tone for how they experience the campus. Kilroy Realty Corp. — the project owner — left no stone unturned, from design and prefabrication to seismic resilience and community impact.

Prefabrication eliminates challenges

From day one, the location of KOP's 1,983-space parking structure challenged traditional construction methods. The structure is in an urban setting and adjacent to the ongoing construction of other KOP campus buildings.

Kilroy needed to ensure the structure would be resilient to seismic activity — a necessity in California — as well as aesthetically pleasing and constructed without causing unnecessary disruption or traffic. After exploring multiple options, the developer decided on prefabrication instead of traditional cast-in-place concrete.

"Prefabricating the concrete offsite minimized disruption and simplified communication on an already congested construction site with a limited laydown area," said Jonas Vass, the executive vice president of development at Kilroy. "Logistically, it made sense to consider prefabrication. Traditional cast-in-place and the logistics surrounding it wouldn't have worked well for this project. I don't think we could deliver the parking structure as efficiently as we did without prefabrication."

From previous roles, Vass was familiar with Clark Pacific, a Sacramento-based design-build manufacturer with more than 60 years of experience with prefabricated building systems. Clark Pacific served as the general contractor, manufacturer, and architect of record for the parking structure. Although Kilroy has prefabricated buildings in the past, this project was the company's first time using this method for a parking structure.

The lateral system for the parking structure is a special hybrid moment frame consisting of prefabricated moment columns that are 2 feet thick by 3 feet, 8 inches wide, and 101 feet tall, as well as moment beams that are 2 feet thick by 4 feet tall and 19 feet long. The remainder of the structure consisted of prefabricated double tee beams that are typically 24 inches deep and 61 feet long; rectangular beams that are 2 feet wide by 2.5 feet tall and 28 feet, 4 inches long; and gravity columns that are 2 feet thick by 3 feet, 8 inches wide, and 101 ft tall.

The parking structure is accentuated with a perforated metal screen that covers 60% to 70% of the facility and was designed to accentuate the blue and gray tones of the nearby water.

Early engagement is critical

Successfully leveraging prefabrication requires engagement and collaboration between the owner and design team from the onset of a project. For Kilroy, this process led to early decisions on design elements, which turned out to be advantageous. Vass and his team collaborated with designers, deciding on color, texture, and the overall aesthetics of the parking structure. Prefabrication gave Kilroy more options for enhancing the structure's visual appeal with finishes as compared to cast-in-place construction.

"Prefabrication gave us flexibility with the finishes that we wouldn't have had with traditional methods, making cast-in-place concrete the obvious choice for Class A, premium built buildings," Vass said. “With precast, we're getting to make a lot of decisions on color and texture."

The prefabricated precast is color-integrated and accentuated with a perforated metal screen that covers 60% to 70% of the structure. The screen was designed to accentuate the blue and gray tones of the nearby water. Its panels feature holes of varying sizes, giving the structure a resemblance to rolling waves. At night, the screen is backlit, transforming the structure into a shimmering jewel.

"The design and accurate installation of the metal screen were critical,” Vass said. “With the screen’s size and prominence, any mistakes in its design or construction would have derailed the project quickly. Despite this complexity, the screen came together seamlessly. It could very well be the most remarkable feature of the entire project," Vass said.

Kilroy also took extra care to optimize traffic flow in anticipation for when the project is fully occupied. Clark Pacific conducted timing studies and explored various layouts to determine the best placement of lanes and entry and exit points. The structure features vehicle entries on three levels and three sides, as well as reversible lanes with light-emitting-diode digital signage to guide traffic for quick entry and exit.

Self-righting system addresses seismic concerns

Building for seismic resiliency added another layer of complexity that Kilroy was able to address with a precast hybrid moment frame (PHMF), a self-righting lateral system that dissipates seismic energies. As part of a PHMF, energy-dissipating steel reinforcing bar yields while a post-tensioning cable restores the frame to its original position with no residual drifts. This feature ensures the structure's strength and resilience, even in seismic events. After a seismic event, the structure will right-size itself, limiting damage and, in most cases, enabling people to safely reoccupy the garage immediately.

"When it comes to resilience, there are a lot of things to consider on any project," Vass said. "In this case, and in addition to the structure itself, we had to think about everything that attaches to it, from the stairs to the elevator towers. All these considerations affect how the building performs after a seismic event. The precast hybrid moment frame is an investment in long-term planning for the KOP campus.” 

The Kilroy Oyster Point parking structure was recently awarded the prestigious Platinum Verified Earthquake Rating from the U.S. Resiliency Council (USRC), a non-profit organization for implementing and disseminating rating systems that describe the performance of buildings during earthquakes and other natural hazard events. Platinum is the council's highest rating.

Used by public and private owners and communities, the USRC's performance rating system forms the basis of economic and financial incentives developed by lenders and insurers to reward high-performing buildings. Achieving a Platinum rating requires that a building meet strict performance safety, damage, and recovery thresholds. Platinum-rated buildings suffer negligible damage, with repair costs less than 5% of the building's replacement cost and facilitate functional recovery immediately or within a few days of a major seismic event.

The Kilroy Oyster Point parking structure was recently awarded the U.S. Resiliency Council’s Platinum Verified Earthquake Rating, which requires that a building meet strict performance safety, damage, and recovery thresholds.

Collaboration on a congested site

As construction began on the office buildings, the parking structure's 2-acre site was excavated, and its structural elements were precast under controlled conditions at Clark Pacific's Woodland plant outside Sacramento, California. Clark Pacific created a mock-up of the structure at its plant to help Vass and his team visualize how the finished structure would look.

"It was a very seamless and collaborative process,” Vass said. “We were able to visit the plant, inspect the structural elements, and provide input as it progressed. Avoiding the potential issues and on-site congestion that we would have had with cast-in-place allowed us to move the parking structure forward quickly and continue constructing three adjacent buildings on the campus without interruption."

Working alongside the construction of three campus buildings, with hundreds of workers and heavy equipment on-site, made coordination among various stakeholders crucial. "Throughout the process, our team, Clark Pacific, and the Oyster Point general contractor for the campus office buildings, Hathaway Dinwiddie, worked together to optimize plans and avoid clashes," Vass said. "One of our amenity buildings is connected to the parking structure through an expansion joint, so we had to collaborate to ensure the systems and parts came together as planned."

At any given moment, several cranes were simultaneously erecting three large biotech lab buildings on a segment of the 50-acre property to be served by the parking structure. By contrast, Clark Pacific's presence on the site was minimal, consisting of no more than a 10-member field erection crew.

Prefabricating the structural elements reduced the need for extensive on-site labor and enabled efficient delivery of components. The team was able to schedule truck shipments of precast elements on a just-in-time basis, eliminating the need for a large laydown area. The streamlined logistics translated to a shorter construction schedule, saving months compared to a cast-in-place structure.

Looking ahead

The Kilroy Oyster Point parking structure is in the final stages and nearing completion. As of press time in early December, the plan is to turn the parking structure over to the owner by the end of 2024.

"We're in the home stretch," Vass said. "Prefabrication allowed us to overcome complex construction challenges and create a parking structure that is resilient, stunning, and will serve our tenants and their guests for decades to come." 

The Kilroy Oyster Point parking structure exemplifies modern engineering, construction, and architectural innovation. From prefabrication to seismic resilience, it is a blueprint for designing and constructing parking structures in dense urban environments.

Aaron Alhady is the general manager of the Design-Build Division Clark Pacific. He can be reached at aalhady@clarkpacific.com.

Tags: ArchitectsConstructionConsultantsEngineersPrefabrication

parkingtodaystaff

Related Stories

Guest Experience Doesn’t Start in the Lot: It Starts in Their Inbox

Guest Experience Doesn’t Start in the Lot: It Starts in Their Inbox

by parkingtodaystaff
May 1, 2025

ADVERTORIAL by Kyle Lugt We’ve all been there. You’re invited to a campus event, a conference, or a doctor’s appointment,...

Not Just a Garage but a Landmark

Not Just a Garage but a Landmark

by parkingtodaystaff
May 1, 2025

The Kansas City International Airport parking garage combines cutting-edge design, sustainability, and passenger convenience with a stunning ventilated glass façade....

Making Parking Smarter with Seamless Data Standards

Making Parking Smarter with Seamless Data Standards

by parkingtodaystaff
May 1, 2025

Adopting a common data framework can simplify integrations, improve management, increase compliance, and enhance user experiences in parking and curbside...

Raising the Bar for Enforcement Professionals

Raising the Bar for Enforcement Professionals

by jaylanders
May 1, 2025

IPMI’s PECP credential equips frontline staff with skills, confidence, and industry recognition. By Jay Landers Last November, the International Parking...

Load More

Recommended

Innovation Navigator … October 2024

October 1, 2024
Parking Prowess at the 1996 Olympics

Parking Prowess at the 1996 Olympics

January 31, 2025

Related Articles

Artificial Intelligence and Parking: What the Public Thinks — And Why It Matters
Main

Rewriting the Parking Narrative: Jobs, Innovation, and Public Perception

May 1, 2025
We Need to Talk: AI is Writing Your Content, and It Shows
Airport

We Need to Talk: AI is Writing Your Content, and It Shows

May 1, 2025
Making Parking Smarter with Seamless Data Standards
Airport

Making Parking Smarter with Seamless Data Standards

May 1, 2025
Guest Experience Doesn’t Start in the Lot: It Starts in Their Inbox
Airport

Guest Experience Doesn’t Start in the Lot: It Starts in Their Inbox

May 1, 2025
Parking Tech’s Most Underused Feature: Common Sense 
Technologies

Parking Tech’s Most Underused Feature: Common Sense 

May 15, 2025
Parking Playbook: Oregon’s Guide to Smarter Spaces
Municipal

Parking Playbook: Oregon’s Guide to Smarter Spaces

May 1, 2025
No Result
View All Result
Parking Today

Navigate Site

  • Advertise with Us
  • Contact
  • Privacy Policy

Follow Us

No Result
View All Result
  • Home
  • Industry News
  • Magazines
  • Buyer’s Guide
  • PIE25 Event Home
    • PIE25 Event Home
    • Attendee Registration and Travel Details
    • Content Details
    • Exhibitor & Sponsor Partnerships
    • ParkFlix Film Festival
    • Speaker Applications
  • Segments
    • Higher Education
    • Municipal
    • Airport
    • Events
    • Valet
    • Medical
    • Commercial
    • Retail
    • Hospitality
  • Technologies
    • Gated
    • Ungated
    • Enforcement
    • Payments
    • Permits
    • Vehicle Detection
    • Wayfinding and Occupancy
    • Curb Management
    • Valet
    • Events
    • EV Charging
    • Analytics
    • Consumables
    • Lighting
  • Suppliers
    • Private Operators
    • Consultants
    • Engineers
    • Architects
    • Financial
    • Insurance
    • Mergers and Acquisitions
  • About Us
    • Industry Events
    • Parking Jobs Network & RFP/RFQ’s
    • Podcast Network
    • Next Level – Webinar
    • Contact
    • Advertise with Us
    • Subscribe to Parking Today

Skip to content
Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset